newhead1 newhead2 newhead3 newhead4 newhead5 newhead6 newhead7

Leed Construction

COM­MIT­MENT:
As a Gen­eral Con­trac­tor, TRP Con­struc­tion is com­mit­ted to pro­vid­ing the fol­low­ing ser­vices (as required by spec­i­fi­ca­tion, but not lim­ited to) on a LEED reg­is­tered project:

  • ero­sion and sed­i­men­ta­tion control
  • stormwa­ter runoff control
  • air qual­ity con­trol and use of low-​emitting materials
  • pro­tect green space and pre­serve habitat/​natural resources
  • par­tic­i­pate in the reduc­tion of waste through re-​use/​recycling of build­ing materials
  • source build­ing mate­ri­als locally
  • pro­vide LEED team mem­bers with writ­ten documentation

PROJECT EXPE­RI­ENCE:

2016 — Uni­ver­sity of Guelph Mac­Don­ald Hall Ren­o­va­tions - $9.9MLEED Silver
LEED Con­sul­tant: Rowan Williams Davies & Irwin Inc.
TRP LEED Team Mem­bers: Matt Postma, Carel Van­der­sluis, Tim Scott, Ron Zaleschuk
2015 — Welling­ton County Library Fer­gus Branch — 3-​storey Addi­tion - $3.8M
Sus­tain­able Design & Con­struc­tion — Green Legacy Pro­gram Emer­ald Standards
Con­sul­tant: +VG Archi­tects
TRP Team Mem­bers: Matt Postma, Jason Plumb, Garth Spanninga
2011 — City of St. Thomas Demo­li­tion of 3 Insti­tu­tional Build­ings - $295K - LEED Gold
LEED Con­sul­tant: Mor­ri­son Her­sh­field
TRP LEED Team Mem­bers: Peter Van­der­sluis, John Goudswaard
2011 — Welling­ton County Library Puslinch Branch — New Con­struc­tion — $1.5M
Sus­tain­able Design & Con­struc­tion — Green Legacy Pro­gram Emer­ald Standards
Con­sul­tant: L. Alan Grin­ham Archi­tect Inc.
TRP Team Mem­bers: Matt Postma, David Koning
2010 — Uni­ver­sity of Guelph — Thorn­bor­ough Build­ing New Foun­da­tion and Ser­vice Tun­nel - $571KLEED Silver
LEED Con­sul­tant: Mor­ri­son Her­sh­field
TRP LEED Team Mem­bers: Matt Postma, Bob Wallace